Hubert E Butler Construction Co Work History
Great Pricing | Delivery Available | Free Quotes
Great Pricing
Delivery Available
Free Quotes
Check Out the Clients We've Served
Over the years, Hubert E Butler Construction Co has handled a wide variety of projects for customers of all types. Take a look at the list below to learn more about our work history and capabilities. To find out what we can do for you and for a free quote, please contact us today.
UConn - Storrs Campus 2017
- Greer Fieldhouse parking lot improvements
Suffield WPCA 2016-2017
- Stream Bank Stabilization
Airline Trail Construction - East Hampton, CT 2016
- Drainage and base improvements
Site Improvement Project – Parker Hannifin Corp., N. Haven – April 2016
- Abandon Septic System, Install and Tie-in Sanitary Sewer System
Bourdon Forge - 2015 - 2016
- Excavation and concrete for machine pits
On-Call Construction Crew – The Mattabassett District – 2015 - 2017
- Emergency and scheduled repairs for the District Sewer Plant
Quinebaug River Trail and Drive – Putnam, CT - June 2015 – April 2016
- Construction of walking trail and driveway to sewer plant
Northeast Utilities 1120 Line Removals – Montville, CT – Aug. 2014 – Nov. 2014
- Removal of 2,000 LF of existing conduit, substation footing removals
NRG Engineered Controls, Montville, CT – April 2014 – April 2015
- Environmental remediation of site, stone cover, cap with Geoliner
On-Call Construction Crew – Town of Southington – May 2014 – October 2014
- Drainage repairs on various roads through Southington
Middlesex Comm. College – Cafeteria Expansion – Middletown – Nov. 2013 – Oct. 2014
- Site work and utility installation for building addition
TOMZ Corp. Addition and Site Improvements – Berlin, CT – Aug. 2013 – May 2014
- Building addition and upgrade to subsurface detention system
TOMZ Corp. Addition and Site Improvements – Berlin, CT – Aug. 2013 – Nov. 2013
- Building addition and upgrade to subsurface detention system
Sears Park Site Improvements Phase I – East Hampton, CT - May 2013
- Drainage and parking improvements to control runoff to Lake Pocotopaug
I-395 SB Service Plaza Reconstruction – Montville, CT – Oct. 2012 – Oct. 2013
- Site improvements to interior and exterior of service plazas
I-95 SB Service Plaza Immediate Drainage Repairs – Branford, CT – March 2012
- Replacement of headwalls, manholes, and slope piping for failed drainage system
Rte. 15 Merritt Parkway SB Service Plaza Renovation – Fairfield, CT – Feb. 2012 – Oct. 2012
- Site work, environmental remediation, and utilities for service plaza upgrades
I-395 Service Plaza Renovations – Plainfield, CT – Oct. 2011 – June 2012
- Site work, environmental remediation, and utilities for service plaza upgrades
Pine Brook Rd. Culvert Replacement – East Hampton, CT – Aug. – Sept. 2011
- Replace existing culvert with twin culvert and gabion wing walls
I-395 SB Septic System Replacement – Montville, CT – May – July 2011
- Complete septic system upgrade
School Trail Project, Marlborough, CT – Nov. 2010 – April 2011
- Excavate, grade, and base 3,400 LF with a footbridge
NRG Ash Settling Basin Closure, Middletown, CT - Aug. – Oct. 2010
- Relocate 50,000 CY of sand and ash, cap with Geoliner
Connecticut Service Plaza Drainage Maintenance – Various Sites, July 2010
- Clean and riprap existing outlet structures on I-95, Rte.15, I-395
Slope Stabilization and Retaining Wall Removal, Squantz Pond State Park, Nov. 2009
- Remove existing wall, install concrete block mat system
Webster Brook Crossing Pipe Support Replacement – Berlin, CT July 2009
- Replace timber pipe cradles beneath 60" trunk sewer line, stream bed improvements
Box Culvert and Standard Riprap Channel Installation – Portland, CT 2009
- Drainage improvements for YMCA Camp Ingersoll
Spruce Brook Crossing Pipe Support Replacement – Berlin, CT Feb. 2009
- Replace timber pipe cradles beneath 66" trunk sewer line, install gabion system
Wood Duck Pond Subdivision Road – Berlin, CT Oct. 2008 – April 2009
- Performed all site work for Valentine Builders, Berlin, CT, including storm, sanitary, and water utility installation.
Silver Lane Cemetery Roadway Expansion – E. Hartford, CT July - Oct. 2008
- Complete site work for the Town of East Hartford, earthwork, drainage, water line, and landscaping.
Belltown Square CVS Site – East Hampton, CT Oct. 2007 – May 2008
- Complete site work and utility installation for Allied Construction, Manchester, CT.
Fire Pond Improvements, Town of East Hampton, CT Aug. 2007 – Dec. 2007
- Remove and dispose of lead-contaminated material, install new intake structure with associated piping.
South Ash Lagoon Cleaning, Mattabassett District, Cromwell, CT June 2007
- Excavate and transport incinerator ash to district landfill
Share On: